
Abu Dhabi Bus 44 Timings, Route, Stops & Fare Guide
Abu Dhabi Bus 44 is a convenient public bus service connecting Cruise Terminal and Abu Dhabi Ladies Club. It is widely used by residents, commuters, and visitors because it provides an affordable way to travel through several important areas of the city. The route passes educational institutions, shopping areas, hospitals, parks, and major landmarks, making it useful for everyday travel.
Whether you’re commuting to work, sightseeing, or visiting nearby attractions, this guide covers everything you need to know about Bus 44, including its timetable, route, stops, fare, travel time, and useful travel tips.
Abu Dhabi Bus 44 Route Overview
| Route Details | Information |
|---|---|
| Bus Number | 44 |
| Starting Point | Cruise Terminal |
| Ending Point | Abu Dhabi Ladies Club |
| Route Length | Approximately 22–23 km |
| Total Stops | Around 49 Stops |
| Estimated Journey Time | About 1 Hour 16 Minutes |
| Operating Days | Daily |
Abu Dhabi Bus 44 Timings
Bus 44 operates throughout the week with services running from early morning until late evening.
| Service | Time |
|---|---|
| First Bus | 05:34 AM |
| Last Bus | 11:04 PM |
| Operating Days | Monday – Sunday |
Passengers can also check departure times from both terminals before beginning their journey.
Bus Frequency
Bus 44 runs regularly throughout the day, making it a reliable option for daily commuters.
| Details | Information |
|---|---|
| Frequency | Every 20–30 Minutes |
| Service Availability | Daily |
Route Highlights
The route begins at Cruise Terminal and travels through several important parts of Abu Dhabi before reaching Abu Dhabi Ladies Club.
Some well-known locations served along the route include:
- Cruise Terminal
- Police Station
- Electra Park
- Sheikh Khalifa Medical City (SKMC)
- Khalifa University
- Mushrif Mall
- Sheikh Zayed Grand Mosque
- Abu Dhabi Ladies Club
These locations make Bus 44 a practical choice for students, workers, shoppers, and tourists.
Major Bus Stops
Bus 44 serves approximately 49 stops across Abu Dhabi.
| Major Stops Along the Route |
|---|
| Cruise Terminal |
| Police Station |
| Electra Park |
| Sheikh Khalifa Medical City (SKMC) |
| Khalifa University |
| Mushrif Mall |
| Sheikh Zayed Grand Mosque |
| Abu Dhabi Ladies Club |
The complete route includes additional stops between these locations to improve city-wide connectivity.
Abu Dhabi Bus 44 Route Map
44Â Route Time Schedule by City
Important Roads Covered
During its journey, Bus 44 passes through several major roads, including:
- Al Zahiyah Street
- Zayed The First Street
- Sheikh Rashid Bin Saeed Street
- Al Falah Street
These roads connect many residential, commercial, and public service areas throughout Abu Dhabi.
Fare Information
Bus 44 is an affordable public transport option.
| Fare Details | Information |
|---|---|
| Starting Fare | From AED 2 |
| Additional Charges | Based on Distance Traveled |
| Payment Method | Hafilat Card |
Passengers should ensure they have sufficient balance on their Hafilat card before boarding.
Route Map
A route map helps passengers understand the direction of travel from Cruise Terminal to Abu Dhabi Ladies Club and locate important stops along the way. Reviewing the map before your trip can make navigation easier, especially for first-time riders.
Passenger Tips
To enjoy a smoother journey on Bus 44, keep these tips in mind:
- Arrive at the bus stop a few minutes before departure.
- Carry a valid Hafilat card with enough balance.
- Check the latest timetable before traveling.
- Allow extra travel time during busy periods.
- Review the route map if you are unfamiliar with the area.
Quick Summary
| Feature | Details |
|---|---|
| Route | Cruise Terminal → Abu Dhabi Ladies Club |
| Distance | Approximately 22–23 km |
| Stops | Around 49 |
| Journey Time | About 1 Hour 16 Minutes |
| First Bus | 05:34 AM |
| Last Bus | 11:04 PM |
| Frequency | Every 20–30 Minutes |
| Fare | From AED 2 |
| Payment | Hafilat Card |
Conclusion
Abu Dhabi Bus 44 offers a reliable and budget-friendly way to travel between Cruise Terminal and Abu Dhabi Ladies Club. Covering approximately 22–23 km with around 49 stops, the route connects several important destinations, including hospitals, shopping centers, universities, parks, and the Sheikh Zayed Grand Mosque. With daily service, frequent departures, and affordable fares, Bus 44 is a practical transport option for both residents and visitors exploring Abu Dhabi.







